29 October 2014
Finishing Other Work
Now that the frenzy of knitting a Rhinebeck Sweater RIGHT NOW is over, I have been able to go back to the projects that were dropped for the cause. Progress goes well on a second sock. That fine lace wrap that's been languishing? Well, it continues so.
I did however, finally get the last six inches of the Darjeeling Shawl border done. It was tight. I had added the pink sock yarn accent to stretch the yardage but still I was convinced that the yarn would run out. In the end, I had about a metre left after casting off. Phew.
This yarn. This yarn! I love it so very much. Not only it is the souvenir of my 2013 trip to VK Live New York, but it has been through such trauma. It's the only skein I saved from the bug episode of last winter. When I opened its bag and saw (sorry) icky eggs, I did what I did with all other infected skeins. I chucked it out the door, onto the fire escape. Yet somehow, I could not bring myself to carry this favourite skein down to the trash. I unwound it and hung it on a plant hook. It hung there exposed to the elements, uncovered, in last winter's arctic temperatures for a week. Then I shook it vigourously and brought it inside for a day long soak in tepid water and Eucalan. After it dried, it was bagged and spent another week in the freezer. Nothing could have survived that.
Now it is my lovely new shawl. The Rustic fingering weight looks great in garter stitch. And I loved my first experience with a knitted on border. The effect is so pretty and has the the added bonus of no long, long, cast off. Win,win, I say.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment